Learn about the ongoing 公共工程 and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Supervisor of Elections Warehouse
Last Updated: 04/16/2024 Category: 县设施 Category: 已缴纳的销售税 当前阶段: Planning and Project Approval
提供新的20,000 sqft +/- facility up to current code, meet needs of required climate controlledspace by the Supervisor of Elections. The facility shall include climate-controlled storage area for sensitive polling equipment and related supplies and support staff. Must be readily accessible and support staff needs for monitoring tabulation. Preferably house SOE administrative offices and serve public visitation in the same location. Includes 10,000 sqft for emergency managemnet and facilites.Sheriff 政府 and Hardened 911 Facility
Last Updated: 04/16/2024 Category: 已缴纳的销售税 Category: 县设施 当前阶段: Planning and Project Approval
Current facility is on airport-owned land with lease term up for renewal in 2023. Current building is a metal building repaired from damage in Hurrican Charley which is still suseptible to hurrican damage. It is not functionally laid out for current needs or growth. It is not designed or constructed to the needs of a modern law enforcement agency. E 911 will be colocated in the same facility.Last Updated: 04/16/2024 类别:公用事业 当前阶段: 建设
建设 of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.Various Intersection Improvements
Last Updated: 04/15/2024 类别:巷道 当前阶段: 设计开发
The design and construction of new turn lanes and traffic signal modifications at various intersections around Port Charlotte, including Murdock Circle, 科克伦大道, Peachland大道, and Veterans Boulevard.
Bayshore Live Oak Park - West Fishing Pier
Last Updated: 04/15/2024 Category: 公园和娱乐 当前阶段: Planning and Project Approval
Total replacement of the western fishing pier at Bayshore Live Oak Park.Last Updated: 04/15/2024 类别:巷道 当前阶段: 设计开发
Widen Kings Highway to a 4 lane divided roadwayCharlotte Harbor CRA - Melbourne Street multi-use path
Last Updated: 04/15/2024 类别:人行道 当前阶段: 设计开发
Construct multi-use path on Melbourne Street from U.S. 41号至港湾道.
Charlotte Harbor CRA - Parmely Street road widening and sidewalk
Last Updated: 04/15/2024 类别:巷道 当前阶段: 设计开发
Reconstruct and widen Parmely Street from U.S. 41号至湾岸道.
Construct multi-use path on Parmely Street from U.S. 41号至湾岸道.