Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Last Updated: 03/13/2024 Category: Sidewalks Current Phase: Planning and Project Approval
Gasparilla Pines Boulevard PathwayFruitland Avenue Avenue of the Americas Sidewalk
Last Updated: 03/13/2024 Category: Sales Tax Funded Category: Sidewalks Current Phase: Construction
Fruitland Avenue Avenue of the Americas SidewalkSunset Boulevard East Sidewalk
Last Updated: 03/13/2024 Category: Sales Tax Funded Category: Sidewalks Current Phase: Construction
Sunset Boulevard East SidewalkBridgeless Barrier Islands Accessibility Study
Last Updated: 03/12/2024 Category: Other Current Phase: Planning and Project Approval
This Study is focused on exploring alternative/additional mode(s) of access to/from Charlotte County's bridgeless barrier islands for the transferring of people, goods, and/or services between the islands and the mainland. These islands include Palm Island, Little Gasparilla Island, Don Pedro Island, and Knight Island/Thornton Key.Last Updated: 03/12/2024 Category: Roadway Current Phase: Construction
The purpose of this project is to resurface Charlotte County roadways in the following districts: Greater Port Charlotte, Pirate Harbor, Woodland Estates, Road and Bridge.Various Intersection Improvements
Last Updated: 03/06/2024 Category: Roadway Current Phase: Design Development
The design and construction of new turn lanes and traffic signal modifications at various intersections around Port Charlotte, including Murdock Circle, Cochran Boulevard, Peachland Boulevard, and Veterans Boulevard.
Last Updated: 03/06/2024 Category: Utilities Current Phase: Construction
Construction of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.South Gulf Cove Bridge Repairs - Construction
Last Updated: 03/06/2024 Category: Bridges Current Phase: Construction
South Gulf Cove Bridge Repairs - (Bridges #014053, #014054, #014055, #014056)Charlotte Harbor CRA - Melbourne Street multi-use path
Last Updated: 03/04/2024 Category: Sidewalks Current Phase: Design Development
Construct multi-use path on Melbourne Street from U.S. 41 to Harborview Road.